          |
|

BUILDING TYPE/SIZE
Equipment Rental
LOCATION
Lexington, Kentucky
OWNER/CLIENT
United Rental
CONSTRUCTION COST
$ 500,000 (Shell )
DELIVERY METHOD
Design/Build
SCHEDULE
Fast Track – 5 Months
Design & Construction.
|
|
UNITED RENTAL
This simple 25,000 s.f. Rental Equipment Facility
demonstrates that small projects can be effectively and economically
produced using Tilt-up Concrete Panels.
Originally designed and “bid” as a masonry
exterior, Bristol Group redesigned the project for Tilt-up reducing the
overall project budget and schedule, while providing a superior, durable
and attractive facility.
Completed during a very difficult winter, on schedule,
in 5 months.
 |