Construction type/size
Foundation & Structural Steel
for 1,600 Ton Stamping Press
Design & Construction Location
Somerset, KY
Owner/client
Toyotetsu America, Inc.
Construction cost
$ 560,000
Delivery method
Design/Build
Schedule
Less than 3 months
|
|
Toyotetsu America, Inc.
1600 Ton Press Foundation
This project is a demonstration of the efficiency of the Design/Build process. Bristol Group engineered and self-performed excavation, concrete and structural steel for this 1600 ton transfer press foundation. The schedule was maintained in spite of the discovery and correction of unsuitable backfill conditions under the existing slab.
Other aspects of this project included the design and drilling of caissons, construction of a conveyor pit, electrical work and water piping and the extension of an existing concrete mezzanine. The project was completed in 76 days, 8 days ahead of schedule.


|