Building type/size
Pre-Engineered Metal
Building Addition/25,000 sf
Rim Line Machine Foundations

Location
Frankfort, KY

Owner/client
Topy Corporation
Kajima Construction Services

Construction cost
$ 880,000

Delivery method
Design/Build

Schedule
9 months

 

Topy corporation Rim line #3

The challenge of placing 12’ of fill in winter conditions was solved by Bristol’s sitework crews. With minimal cost impact, shot rock was substituted and time was recovered to meet the owner’s production commitment. The project included site preparation, a 25,000 sf warehouse addition, a new 10 ton overhead crane and rim line machine foundations in the existing facility.

Bristol Group designed and provided construction management services for mechanical, electrical and fire protection trades on this project. It was completed one month ahead of schedule.

Copyright 2008 - All rights reserved.  All material presented on this web site is the sole property of Bristol Group, and cannot be copied without written authorization from Bristol Group Inc.