PROJECT TYPE
Industrial/Process

LOCATION
Berea, Kentucky

OWNER/CLIENT
Kentucky Steel Corporation
Sonoda Engineering, LTD.

CONSTRUCTION COST
$75,000.00

DELIVERY METHOD
Design/Build

SCHEDULE
Fast Track – 3 Months
Design & Construction

 

KENTUCKY STEEL CORPORATION

Japanese foundation requirements were developed into engineering drawings for the construction of this cut-to-length steel sheet line.  Equipment was unloaded, set, leveled and aligned to +/- 0.5 mm. Project required the design and construction of complex equipment foundations.

 

 

 