          |
|

PROJECT
TYPE
Industrial/Process
LOCATION
Berea, Kentucky
OWNER/CLIENT
Kentucky Steel Corporation
Sonoda Engineering, LTD.
CONSTRUCTION
COST
$75,000.00
DELIVERY
METHOD
Design/Build
SCHEDULE
Fast Track – 3 Months
Design & Construction
|
|
KENTUCKY STEEL CORPORATION
Japanese foundation requirements were developed into
engineering drawings for the construction of this cut-to-length steel
sheet line. Equipment was
unloaded, set, leveled and aligned to +/- 0.5 mm. Project required the
design and construction of complex equipment foundations.

|