BUILDING TYPE
Industrial Manufacturing

LOCATION
Campbellsville, Kentucky

OWNER/CLIENT
Murakami Manufacturing U.S.A., Inc.

CONSTRUCTION COST
$2,415,168

DELIVERY METHOD
Design / Build

SCHEDULE
Months Fast Track
Design & Construction

 

 

MURAKAMI MANUFACTURING 2004 EXPANSION

This project offered Bristol Group a unique opportunity to demonstrate our wide range of engineering and architectural abilities. Bristol Group designed and simultaneously constructed an injected molding expansion, paint area addition, manufacturing and assembly area, storage addition, and office expansion.

The project was managed entirely from the site using a seasoned project manager and project engineer. Preliminary planning and scheduling were dictated by the fact that the facility had to maintain full production throughout the construction process.

Bristol Group was able to fast track the construction process and delivered the facility to the Owner ahead of schedule and under budget.

Copyright 2002 - All rights reserved.  All material presented on this web site is the sole property of Bristol Group, and cannot be copied without written authorization from Bristol Group Inc.