BUILDING TYPE
Industrial/Process
LOCATION
Paris, Kentucky
OWNER/CLIENT
Central Manufacturing Co.
CONSTRUCTION COST
$1,900,000
DELIVERY METHOD
Design/Build
SCHEDULE
Fast Track – 6 Months
Design & Construction
|
|
CENTRAL MANUFACTURING CO. PRESS BAY ADDITION
#2
This project included the 56 ft. high structure and foundation
required to accommodate a 4,000 ton transfer press.
Significant savings were achieved by “jacking” a 13,000 s.f.
portion of the existing
roof from an elevation of 30 ft. to 56 ft. with minimal disruption of
ongoing operations. This
unique operation was accomplished in one week.
Bristol Group was
responsible for the design and construction of the complex press
foundation, the installation of (2) bridge crane structures for handling
25 ton coils and stamping dies and the “high-bay” enclosure.
Project involved close
coordination of owner’s equipment requirements and “value
engineering” to get the project within budget.
Total design and construction time was less than 6 months.
|