LBX Distribution Warehouse

LBX 005 580

The North American Headquarters and Training Facility for LBX Company, LLC showcased Bristol Group’s ability to meet a customer’s needs at all stages of project delivery. From site location study through design and construction, Bristol professionals worked with the client’s team to deliver a facility which combines the substantial appearance of tilt-up concrete, the efficiency of state-of-the art building systems, and the appeal of first class finishes.

Project Specs
Building Type and Size: Warehouse, 50,000 sq.ft.
Location: Lexington, KY
Owner/Client: LBX Company, LLC
Construction Cost: $2,689,774
Delivery Method: Design/Build
Schedule: Fast Track, 12 Months; Design and Construction
Completion: 2007

 

An open floor plan allowed maximum use of space. Conventional steel construction was utilized in the engineering offices while pre-engineered members were chosen in the high-bay training area. This blend of design elements was both cost effective and well-suited for this mixed-use facility. The second phase of construction included a 50,000 SF distribution center adjacent to the headquarters building. This high-bay, tilt-up structure was constructed in less than 5 months, meeting an aggressive opening deadline set by the customer.