NACCO Materials Handling Group

NACCO overhead

This 230,000 square foot project includes major additions to the manufacturing plant and engineering offices. The project required the relocation of shipping/receiving docks without disrupting ongoing operations.

Project Specs
Building Type and Size: Industrial/Manufacturing
Location: Berea, KY
Owner/Client: Materials Handling Group
Construction Cost: Less than $10,000,000
Delivery Method: Design/Build
Schedule: Fast Track, 12 Months; Design and Construction
Completion: 2002

 

No area on the 56 acre site was unaffected by earthwork operations and the addition of 17 acres of new exterior paving for material storage and site circulation. Design considerations included a heavy steel building frame to provide maximum flexibility for overhead crane placement.