This project offered Bristol Group a unique opportunity to demonstrate our wide range of engineering and architectural abilities. Bristol Group designed and simultaneously constructed an injection molding expansion, paint area addition, manufacturing and assembly area, storage addition and office expansion.

The project was managed entirely from the site using a seasoned project manager and project engineer. Preliminary planning and scheduling were dictated by the need for the facility to maintain full production throughout the construction process.

Project Specs
Building Type and Size: Industrial/Manufacturing
Location: Campbellsville, KY
Owner/Client: Murakami Manufacturing USA, Inc.
Construction Cost: $1,000,000 - $5,000,000
Delivery Method: Design/Build
Schedule: 7 Months; Design and Construction
Completion: 2004