Hitachi Compressor Room Addition

Bristol managed the design and construction of a pre-engineered metal building to house eight (8) 200 HP air compressors and four (4) air dryers supplied. The HVAC design included four air changes per minute inside the space.

Hitachi Compressor-1   Hitachi Compressor-2

Project Specs
Building Type and Size: Industrial
Location: Berea, KY
Owner/Client: Hitachi Automotive Systems Americas, Inc.
Construction Cost: Less than $1,000,000
Delivery Method: Construction Management
Schedule: 3 months