Hitachi Electronics Manufacturing Facility

Hitachi 003 580

Hitachi Automotive Systems teamed with Bristol design professionals to envision a premier facility to house their growing electronic control module (ECM) business.

Project Specs
Building Type and Size: Manufacturing facility; 172,000 square feet
Location: Harrodsburg, KY
Owner/Client: Hitachi Automotive Systems Americas, Inc.
Construction Cost: $5,000,000 - $10,000,000
Delivery Method: Design/Build
Schedule: 10 months
Completion: 2011

 

Tilt-up wall panels coupled with spray foam insulation provides a system that is both thermally and structurally efficient. Clean room space is equipped with air showers, electrostatic dissipating floor coatings, specialty HVAC and filtration systems, and custom glazing assemblies.

This fast-track project started in fall 2010 and completed summer 2011. The speed and efficiency inherent to Design/Build project delivery were essential to meeting the customer’s schedule requirements.

Hitachi 001 580

Hitachi 002 580

Hitachi 004 580