Wolf Creek Dam Seepage Barrier

  • Print

wolf creek dam 13 580

Bristol Group renewed and expanded a history of collaboration with Pyles Excavating, partnering on this high-profile remediation project at Wolf Creek Dam on Lake Cumberland.

Project Specs
Project type: Commercial Building, Precast and Heavy Construction
Location: Jamestown, KY
Owner/Client: Treviicos Soletanche, JV
Construction Cost: $5,000,000 to $10,000,000
Delivery Method: Combined Design/Build and Plan/Spec
Schedule: 4 years phased construction
Completion: 2009

 

Prime contractor Treviicos – Soletanche JV (TSJV) required a range of precast, cast-in-place, building, and demolition services to accomplish their highly technical deep excavation and concrete placement processes on an aggressive schedule.

Over 170 precast tank units were produced in Bristol’s Lexington precast shop and installed on site, creating over a half-million gallons of bentonite slurry storage necessary for the excavation process.

Bristol designed and fabricated an innovative rolling gantry concrete form system for the 4,200 foot guide wall construction that doubled TSJV’s production requirements. Expediting the guide walls ensured an on-time start to the critical barrier wall construction.

wolf creek dam 106 580