BUILDING TYPE
Commercial/Office

LOCATION
Lexington, Kentucky 

OWNER/CLIENT
Rouse Companies 2753 LLC

CONSTRUCTION COST
$845,597

DELIVERY METHOD
Design/Build

SCHEDULE
Fast Track - 5 Months (shell)

 




TODDS PLAZA 

Conceived and designed to provide an urban look, this building was constructed on a high traffic connector road in a growing suburban area. To maximize a small lot, the building was constructed within four feet of the roof overhang of an existing building. Various architectural treatments were added to the tilt-up concrete walls to provide additional articulation and variety. “Dry-stacked” synthetic stone was added to soften the face of the building while serving to distinguish the various retail and office entrances.

The tilt-up panels cast on both the floor slab and remote casting beds were designed to include integral legs, or concrete returns. These panels give the building its distinct appearance as well as create shadow lines and add contrast to the front of the façade.

Copyright 2008 - All rights reserved.  All material presented on this web site is the sole property of Bristol Group, and cannot be copied without written authorization from Bristol Group Inc.