PROJECT
Commercial Office and
Warehouse

SIZE
83,600 s.f.

LOCATION
Lexington, Kentucky 

OWNER/CLIENT
LBX Company, LLC
Contact: Robert Harvell,
President & CEO.
859-245-3902

CONSTRUCTION COST
$5,500,000

DELIVERY METHOD
Design/Build

SCHEDULE
12 Months
Fast track
Completed March 2007

BRISTOL TEAM
J. Todd Ball, Proj. Executive
and Design Leader
David Hastings, Proj. Manager




LBX COMPANY, LLC. HEADQUARTERS & DISTRIBUTION CENTER 

The North American Headquarters and Training Facility for LBX Company, LLC showcased Bristol Group’s ability to meet a customer’s needs at all stages of project delivery. From site location study through design and construction, Bristol professionals worked with the client’s team to deliver a facility which combines the substantial appearance of tilt-up concrete, the efficiency of state-of-the art building systems, and the appeal of first class finishes. An open floor plan allowed maximum use of space. Conventional steel construction was utilized in the engineering offices while pre-engineered members were chosen in the high-bay training area. This blend of design elements was both cost effective and well suited for this mixed-use facility.

The second phase of the project involved construction of a 50,000 of distribution center adjacent to the headquarters building. This high-bay, tilt-up structure was constructed in less than 5 months, meeting an aggressive opening deadline set by the customer.