BUILDING TYPE/SIZE
Commercial/Office
46,500 s.f.
LOCATION
Lexington, Kentucky
OWNER/CLIENT
Turner Development Co.
CONSTRUCTION COST
$ 2,500,000
DELIVERY METHOD
Design/Build
SCHEDULE
Fast Track – 5 Months
Design & Construction

|
|
FORTUNE OFFICE COMPLEX
This three-story office building uses exposed tube
steel decorative elements and glass to create a light, pristine façade.
EFIS wall panels, fabricated at a remote location, were erected
on the conventional steel frame to minimize exposure during winter
construction.
The rear exterior steel stair provides convenient
access to the building while increasing building efficiency and creating
an attractive architectural element.
The 5 month, winter schedule was completed “on time”.


|