HARRODS GLEN SUBDIVISION
This project included excavation, roadway and utility improvements for a new subdivision in Harrodsburg. One significant feature of the project was a large sewage pump station which was installed to serve the development.
Bristol and the client were able to work together through unforeseen subsurface conditions. The client also made revisions to the project design and scope which were treated in a fair and equitable manner.


|